6 Electrical InstallationYASKAWA ELECTRIC TOBP C710606 35D YASKAWA AC Drive - V1000 NEMA Type 4X/IP66 Installation Manual 333. Tighten the cable gland caps.4. Connect the wires to the main and control circuit terminals.■ Reattaching the Front Cover1. Insert the LED operator cable into the correct port on the drive. Refer to theFigure 10.2. Replace the front cover on the drive and fasten the screws according to Table 16.NOTICE: Tighten all screws to the specified tightening torque. Loose screws may allow moisture or dust toenter the protective enclosure and damage drive components.NOTICE: Do not pinch or damage the sealing gasket when attaching the front cover. Damage to the gasketmay allow moisture or dust to enter the protective enclosure and damage drive components.NOTICE: Do not use silicone sealant with cable glands or front cover to reinforce waterproofing. Corrosivevapors produced by the sealant can damage circuit boards and compromise the watertight integrity of theprotective enclosure.NOTICE: Do not pinch the LED operator cable between the waterproof/dustproof enclosure and the frontcover when putting the front cover back on. This could damage the operator cable.■ Front Cover Screws and Tightening TorqueRefer Table 16 for tightening torque specifications.Table 16 Front Cover Installation Screws and Tightening TorqueVoltage Class Model No. CIMR-V InstallationScrew SizeTightening TorqueNm(lb-in)Single Phase 200 V Class BA0001 to BA0012 M5 2.0 to 2.5 (17.7 to 22.1)Three Phase 200 V Class 2A0001 to 2A0020 M5 2.0 to 2.5 (17.7 to 22.1)2A0030 to 2A0069 M6 5.4 to 6.0 (47.8 to 53)Three Phase 400 V Class 4A0001 to 4A0011 M5 2.0 to 2.5 (17.7 to 22.1)4A0018 to 4A0038 M6 5.4 to 6.0 (47.8 to 53)