147ENGINE PACKING1. Put the preserved engine onto a wooden pallet, fix it andpack.2. The engines packing must allow for their storage inwarehouses and mechanical loading/unloading fromcontainers and covered wagons.3. Preservation and packing procedure for each engine must bedocumented in a special report (Act) as shown below:DEEDof preservation and packingof engine YMZ - ___________Engine №_____________Preservation has been performed according to InstructionManual YMZ 8401.3902113 ДИ ___________________Preservation performed by ________________________Date __________________________________________Checked by quality inspector _______________________Date and stamp __________________________________Packing performed by ____________________________Date __________________________________________Checked by quality inspector _______________________Date and stamp __________________________________Represervation date ______________________________Preservation must ensure undamaged condition of the enginesupplied for in-vehicle integration within six months from the date ofpreservation provided that the engine is stored in the warehouse,indoors, without any acids or alkalies being stored in the same room.When being installed into a vehicle, the engine must not requireany disassembly in order to remove protective grease.The documents supplied with the engine must be placed into awater-impermeable pack and kept in a special pocket on the pallet.