679948-YTG-A-011118 Unitary Products GroupNOTE: All dimensions are in inches. They are subject to change without notice. Certified dimensions will be provided uponrequest.ACCESSORIES• Hot Water or Steam Coil - Add 6” to overall heightwhen used• Supply Air Plenum - Add 24-5/8” to overall heightwhen used• Base - Add 23-3/8 inches to overall height when usedFIGURE 10 - UNIT DIMENSIONS - NE240MKLKJHGF5/85/87/8 KNOCKOUTS FOR POWERAND CONTROL WIRINGAIROUTAIROUTBLOWERSECTIONKNOCKOUTFORLIQUIDPIPINGDDELESSBOTTOMPANELKNOCKOUTFOR “N”OD DRAINPIPINGKNOCKOUTFOR “P” ODSUCTIONPIPING5/8 PANEL5/8 BOTTOMPANELD1-3/8 KNOCKOUTFORLIQUID PIPING2-3/42-3/42-3/4 1-3/8 KNOCKOUTFOR 1 ODDRAIN PIPING2-3/8 KNOCKOUTFORSUCTION PIPINGSMALL SIDEPANEL20-3/826-3/429-1/2A BEVAPORATORCOIL SECTION2-5/16CAIRINAIRINAll dimensions are in inches. They aresubject to change without notice. Certi-fied dimensions will be provided uponrequest.TABLE 25: UNIT DIMENSIONS - NE240A B C D E F G H J K L M N P89-1/2 85 26-1/8 29-1/2 59 2-7/16 15-7/8 12-7/16 20-3/4 16 16 20-3/4 1 1-5/8TABLE 26: UNIT CLEARANCES - NE240MINIMUM CLEARANCES 240Side Air with RETURN AIR opening 24”Side with SUPPLY AIR opening 1 24”Side with PIPING CONNECTIONS 24”Side opposite PIPING CONNECTIONS 2 24”Bottom 3 -1. Overall dimension of the unit will vary if an electricheater, a supply air plenum or a base is used.2. If the coil has to be removed, this dimension is requiredto loosen screws that secure the coil to the unit frame.This dimension will also be required for blower motoraccess if the piping connections are made on the oppo-site side of the unit.3. Allow enough clearance to trap the condensate drainlines.