K W350-P1-D-S-SCQuick Setup GuideA ppearance and DimensionInstallation MethodTerminalsWiring DiagramSettings ModeCommunicationEnergy Pulse OutputEvent Logging2Appearance and DimensionInstallation MethodSteps:1. To install the meter on the rail insert the top of the rail into the groove on theback of the meter. Pull the metal clips back and slide the rail across the groove ofthe meter.Unit: mmFront View Side View32. Use the metal clips to tighten the rail to complete installation.3. Before mentioning this step, the steps needed to remove the seal/cover need toTo attach seal/cover back onto the meter place the left side of the cover down ontometer and press down on the right side. When installed correctly you will hear aclicking sound. The steps to attach the other cover is opposite to the above step.4. After inserting the cover, tighten the sealing screws and lay the seal.Pulse OutputIsolation Voltage 2500VacLoad Voltage 0~250VacLoad Current 100mA(max)Relay OutputLoad Voltage 250Vac 30VdcMax Load Current 5A(Resistant Load)Isolation Voltage 2000Vac(1min)Action Time 10msMechanical Life 20 million timesElectrical Life About 50,000 times(5A, 250Vac,Resistant Load)CommunicationRS485 Baud Rate 1200~38400Communication Protocol ModBus-RTUInfrared Communication Non-contact infraredInfrared Baud Rate 1200EnvironmentWorking Temperature -25~70°CStorage Temperature -40~85°CAutomation Components, Inc.Phone: 1-888-967-5224Web: www.workaci.comEmail: techsupport@workaci.comDocument#2305E3201 Revision Date: Apr., 2021 4Terminals5. To open the cover, remove the seal if applicable, unscrew the sealing screws andlife the cover upwards to remove.5Wiring Diagram3 phase 4 wire (3LN, 3CT)KW3503 phase 3 wire (2LL, 3CT)KW3502305 Pleasant View Road, Middleton WI