Instruction manualWater Management Boiler System C 110 L 110VSeite 76 Initial operation Unplug Establish hose connections:o Optionally connect „Water inlet“ with pipeline network or fill manually viafilling porto Connection „Warm water shower water“ with shower topo Connection „Sewage IN“ with shower trayo Connection „Sewage OUT“ with sewage system Connect to power supply At use of the automatic fresh water supply, the max. fill level is controlled by a floatswitch the unit is now ready-to-operateWater inletShower waterSewage OUT Sewage IN