PRE-INSTALLATION CHECKLISTBEFORE GETTING STARTEDEach unit is tested under operating conditions and is thoroughly inspected beforeshipment. At the time of shipment, the carrier accepts responsibility for the unit. Upon receiv-ing the unit, carefully inspect the carton for visible damage. If damage exists, have the car-rier note the damage on the freight bill and file a claim with carrier. Responsibility for dam-age to the dispenser lies with the carrier.CONSIDER LOCATION OF THE FOLLOWING PRIOR TO INSTALL Water supply lines Drain Is the countertop level? Heating and air conditioning ducts Grounded electrical outlet. Enough space to install the dispenser. Include space for a top-mounted ice machine, if necessary. Does the top-mounted ice machine have a minimum clearance on all sides? Located away from direct sunlight or overhead lighting. Can the countertop support the weight of the dispenser? Be sure to include the weight of an icemachine (if necessary) plus the weight of the ice. This unit is not suitable for use in an area where a water jet could be used.4TOOLS REQUIRED Oetiker Pliers Slotted Screwdriver Tubing Cutters Phillips Screwdriver Wrench Cordless DrillPOST MIX ACCESSORIES CO2 Regulator Set CO2 Supply Beverage Tubing Oetiker Clamps/Fittings Water Booster Water Regulator Precision Cutters (if removing/replacing carbonator tank)