Samsung AR TSFA Series manuals
AR TSFA Series
Table of contents
- air conditioner
- Table Of Contents
- Safety Information
- general information
- Installation
- Step 1-2 Verifying model numbers
- Step 1-3 Choosing the installation location
- Step 1-4 Unpacking
- Step 1-5 Preparing materials and tools
- Indoor Unit Installation
- Step 2-3 Connecting the refrigerant pipes
- Step 2-4 Connecting the power and communication cables
- Step 2-5 Optional: Extending the power cable
- Step 2-6 Connecting the drain hose
- Step 2-7 Taping the pipes, cables, and drain hose
- Outdoor Unit Installation
- Step 3-2 Connecting the cables and the pipes
- Installation Inspection and Testing
- Step 4-3 Evacuating the system
- Step 4-4 Adding refrigerant (if needed)
- Step 4-7 Performing final checks and trial operation
- Sub PCB installation(optional)
manualsdatabase
Your AI-powered manual search engine