Ideal Boilers LOGIC Code Combi 26 manuals
LOGIC Code Combi 26
Table of contents
- safe handling
- gas supply
- air supply
- domestic hot water
- wall mounting template
- mounting the boiler
- connecting the flue to the boiler
- fitting the optional roof flue kit (flat or pitched)
- flue terminal position
- assembling the roof flue kit
- connections & filling
- electrical connections
- external electrical controls
- commissioning and testing
- initial lighting
- handing over
- servicing schedule
- burner removal and cleaning
- cleaning the heat exchanger
- replacement of components
- burner injector replacement
- ignition electrode replacement
- flame detection electrode replacement
- gas control valve replacement
- user control pcb replacement
- pump automatic air vent replacement
- diverter valve internal cartridge replacement
- heat engine renewal
- boiler sealing panel seal replacement
- fault finding
- short list of parts
manualsdatabase
Your AI-powered manual search engine