18INsTaLLaTIONIdeal Logic Code Combi - Installation and ServicingFLUE OUTLETThe wall mounting template is located on the internal protectivepackaging.Note.The template shows the positions of the fixing holes and therear flue hole centre for standard installation. Care MUST betaken to ensure the correct holes are drilled.1. Tape template into the selected position. Ensure squarenessby hanging a plumbline as shown.2. If fitting a side flue extend the flue centre line onto the sidewall and measure in 155mm for standard installation.3. Mark onto the wall the following:a The wall mounting plate screw positions (choose one fromeach group).b. The position of the flue duct hole (see diagram below).Note. Mark the centre of the hole as well as thecircumference.4. Remove the template from the wall.13 WaLL MOUNTINg TEMpLaTE14 pREpaRINg ThE WaLLIMpORTaNT.Ensure that, during the cutting operation, masonry fallingoutside of the building does not cause damage or personalinjury.1. Cut the flue hole (preferably with a 5” core boring tool),ensuring that the hole is square to the wall.Both wall faces immediately around the cut hole should beflat.2. Drill 2 holes with a 7.5mm / 8mm masonry drill and insertthe plastic plugs, provided, for the wall mounting plate.3. Locate 2 No.14 x 50mm screws in the wall mounting plate(one at each side, in any of the 3 holes provided at eachside) and screw home.3G9495XSectionthrough wallNote. Check all of the holepositions before drilling.Side flue only5" diameter holeRear flue only5" diameter hole206279-1025831 57 83 109 135 161 187 213 2391.0 2.03.04.05.06.07.08.08.5Notes.1. If the wall thickness is greater than 305mm then dimension "H"* mustbe reduced by the same amount and the offset may be adjusted accordingly.2. For flue lengths greater than 600mm the flue must be inclined by 26mm per 1000mm flue length.* "H" = Distance in metres from side of the boiler to the side wallcode combi 38code combi 33code combi 26206279-10271V - See Diagram BelowExtended centre line155