Ideal Boilers Mexico Super RS470 manuals
Mexico Super RS470
Table of contents
- Table Of Contents
- location of boiler
- boiler water connections
- Air Supply
- water circulation system
- Boiler Assembly - Exploded view
- boiler casing removal
- preparing the boiler
- fitting the flue assembly
- gas connection
- Electrical Connections
- frost protection
- Fault Finding
- handing over
- Gas Supply
- burner and controls assembly removal
- Initial Lighting
- control thermostat replacement
- overheat thermostat replacement (if fitted)
- ignition electrode replacement
- gas valve replacement
- printed circuit board (pcb) replacement
- fault finding
- Short List of Parts
- boiler casing assembly
Mexico Super RS470
Table of contents
manualsdatabase
Your AI-powered manual search engine