Carrier RTU OPEN 11-808-427-01 manuals
RTU OPEN 11-808-427-01
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- What is the RTU Open controller
- Specifications
- Safety considerations
- Field-supplied hardware
- To mount the RTU Open
- To wire the controller for power
- Using an auxiliary control power transformer
- To set the RTU Open's address
- To set the RTU Open's communications protocol and baud rate
- Wiring specifications
- Wiring inputs and outputs
- Input wiring specifications
- Binary outputs
- compressor safety
- additional functions
- Wiring sensors to inputs
- Field-supplied sensor hardware
- Wiring an SPT sensor
- To wire the SPT sensor to the controller
- To wire the SAT sensor to the controller
- To wire a duct sensor to the controller
- Wiring a CO2 sensor
- Wiring an Outdoor Air Quality sensor
- To wire the OAQ sensor to the controller
- To wire the RH sensor to the controller
- To wire a humidistat to the controller
- To wire an enthalpy switch (outdoor air) to the controller
- To wire an enthalpy switch (differential) to the controller
- Wiring a status switch
- To wire a status switch to the controller
- To wire a compressor safety input to the controller
- To wire an occupancy switch or door contact
- Start-up
- Service Test
- Configuring the RTU Open's properties
- Setpoint properties
- Service Configuration properties
- Occupancy
- Supply fan
- Economizer
- Unoccupied Free Cooling
- Enthalpy control
- Heating
- Heat Pump operation
- Demand Limit
- Fan Status
- Linkage
- Linkage Air Source Modes
- Serial number
- Replacing the RTU Open's battery
- FCC Compliance
- Status
- Unit Configuration
- Setpoints
- Alarm Configuration
- Service Configuration
- Maintenance
- Alarms
- I/O Points
- Appendix B: Single Point Linkage and Device Address Binding
- Device Address Binding
- Index
manualsdatabase
Your AI-powered manual search engine