H3C S5830V2-24S manuals
S5830V2-24S
Table of contents
- installation guide
- obtaining documentation
- Table Of Contents
- Table Of Contents
- Preparing for installation
- Cleanliness
- Installation tools
- Installing the switch
- Installing the switch in a 19-inch rack
- Rack-mounting procedures at a glance
- Attaching the slide rails to the rack
- Mounting the switch in the rack
- Grounding the switch
- Grounding the switch with a grounding strip
- Grounding the switch by using the AC power cord
- Installing/removing a fan tray
- Removing a fan tray
- Installing a power module
- Removing a power module
- Connecting the power cord
- Connecting the LSVM1AC650 or LSVM1AC300 power module
- Verifying the installation
- Accessing the switch for the first time
- Connection procedure
- Setting up an IRF fabric
- Planning IRF fabric setup
- Planning IRF topology and connections
- Identifying physical IRF ports on the member switches
- Configuring basic IRF settings
- Maintenance and troubleshooting
- No terminal display
- Appendix A Chassis views and technical specifications
- S5820V2-48S
- S5820V2-52QF
- S5820V2-52QF-U
- S5820V2-52Q
- S5820V2-54QS-GE
- Technical specifications
- Appendix B FRUs and compatibility matrixes
- Fan trays
- Appendix C Ports and LEDs
- SFP+ port
- QSFP+ port
- Base-T autosensing Ethernet port
- LEDs
- Base-T autosensing Ethernet port LEDs
- Appendix D Cooling system
- Index
manualsdatabase
Your AI-powered manual search engine