H3C S6850-2C manuals
S6850-2C
Table of contents
- installation guide
- documentation feedback
- Table Of Contents
- Table Of Contents
- Preparing for installation
- Temperature/humidity
- Laser safety
- Installing the switch
- Installing the switch in a 19-inch rack
- Installation accessories
- Mounting brackets, chassis rails, and grounding cable installation positions
- Attaching the mounting brackets and chassis rails to the chassis
- Connecting the grounding cable to the chassis
- Attaching the slide rails to the rack
- Mounting the switch in the rack
- Grounding the switch
- Installing/removing fan trays
- Removing a fan tray
- Installing/removing power modules
- Removing a power module
- Connecting the power cords
- Connecting a DC power cord
- Installing an expansion module
- Removing an expansion module
- Verifying the installation
- Accessing the switch for the first time
- Connecting the mini USB console cable
- Setting terminal parameters
- Setting up an IRF fabric
- Planning IRF fabric setup
- Planning IRF topology and connections
- Identifying physical IRF ports on the member switches
- Planning the cabling scheme
- Configuring basic IRF settings
- Maintenance and troubleshooting
- Configuration terminal display problems
- Appendix A Chassis views and technical specifications
- S6850-2C
- S9850-4C
- S9850-32H
- Technical specifications
- Appendix B FRUs
- Fan trays
- Appendix C Ports and LEDs
- FE SFP modules
- QSFP28 port
- QSFP+ port
- SFP28 port
- SFP+ port
- QSFP+ port LED
- SFP port LED
- Appendix D Cooling system
manualsdatabase
Your AI-powered manual search engine