Barrus Shire 65 manuals
Shire 65
Table of contents
- RDG603A31 - Issue
- Table Of Contents
- Table Of Contents
- Table Of Contents
- SECTION 1 – Safety Precautions
- Exhaust System
- SECTION 2 – Engine Identification
- SECTION 3 – Component Identification
- SECTION 4 – Control Panel
- Control Panel Overview
- Overall Dimensions of the Standard Control Panel
- SECTION 5 – Installation
- Engine Cooling Water Inlet and Outlet Hose Connections
- Pressurised Water Header Tank
- Calorifier
- Shaft Connection and Propeller Selection
- Engine Alignment
- Engine Inclination
- Electrics
- Engine Oil
- Coolant
- Control Cables
- Control Panel
- Hydraulic Drive Transmissions
- Centa Coupling CF-M-160 (RDG2779)
- PRM 280DP Gearbox with Power Take Off (Optional Extra)
- Installation Check List
- SECTION 6 – Operation
- Stopping Procedure
- Diesel Fuel Additive
- SECTION 7 – Service Procedure
- Air Filter Check and Change
- Disposal of Oil and Related Items
- Primary and Secondary Fuel Filter Change
- Cooling System
- Belt Maintenance
- Belt Replacement
- SECTION 8 – Service Schedule
- Service Intervals
- SECTION 9 – Wiring Diagrams
- Shire 60 & 65 Cold Start Wiring Diagram
- Standard Control Panel Wiring Diagram
- Deluxe Control Panel Wiring Diagram
- SECTION 10 – Technical Data
- Dry Weight of Engine Data
- Shire
- SECTION 11 – Dealer List
- SECTION 12 – Shire Parts
- Declaration of Incorporation of Partly Completed Machinery
- EU Declaration of Conformity with the Exhaust Emissions Requirements of Directive 2013/53/EU
- SECTION 14 – Lubricant Safety Data Sheets
- Torq-Gard Supreme 15W-40
- SECTION 15 – Shire Service Record Card
manualsdatabase
Your AI-powered manual search engine