C HAPTER 2: INSTALLING THE V6100WARNING: Electrical ShockThe equipment must only be installed or serviced by qualified service personnel.To install your V6100, follow these 4 steps:7 Unpack the V6100 (see Unpacking).8 Check the package contents (see Package Contents).9 Mount the V6100 (see Mounting the V6100).10 Cable the V6100 (see Cabling the V6100).After connecting the V6100 to the power source, the power LED on the front panel of thepower supply unit is lit green (after a self-testing period of about 2 minutes). Any powersupply malfunction results in the LED switching off (see Monitoring the V6100 LEDs fordetails on the V6100 LEDs).When you have completed the above relevant sections you are then ready to startconfiguring the gateway (see Chapter 3: Configuring the V6100).UnpackingTo unpack the V6100, follow these 6 steps:1 Open the carton and remove packing materials.2 Remove the V6100 from the carton.3 Check that there is no equipment damage.4 Check, retain and process any documents.5 Notify 3Com or your local supplier of any damage or discrepancies.6 Retain any diskettes or CDs.V6100 Digital Gateway Installation Guide 11