L3447 Emax DC60/108L3728Model ScalePage No.Doc. No.Apparatus1SDH000635R0002t [s]10 -111010 210 310 4-0.1x Pn0-0.3-0.4 -0.2100.5 … 250.525-0.3 -0.1-0.3 … -0.1RP13.2.10.7 Trip curves for function RP13.3 Putting into service13.3.1 ConnectionsFor the connections provided by the user, it is recommended that you comply strictly with the recommendations containedin this document.This will enable us to satisfy all the international reference standards and guarantee perfect operation ofthe relay even under severe environmental and electromagnetic conditions.Pay particular attention to the types of cable, the connections to earth and the recommended maximum distances.13.3.2 TC connection testIf the PR123/DC was installed by the user, it is important, before closing the CB, to check the last line on the display whenthe relay is turned on for the first time via a PR030/B battery unit. No TC disconnected messages must appear; if they do,do not close the circuit-breaker immediately and make the correct connections.13.3.3 TestBefore putting into service, a test can be conducted by means of the specific "Auto test" function whichcan be activated on the PR123/DC. A positive result is shown on the display.Then a test can be conducted on the whole TC chain, again using the specific function (Trip test). A positiveresult is shown by the circuit-breaker opening.To run a Trip Test, press the “i Test” button and the “Enter”button simultaneously.Check the open or closed state of the circuit-breaker on the same "PR123/DC Test" screen, checking thatthe CB is closed and de-energized.13.3.4 Checking connectionsAfter making the initial settings, to ensure that the voltage sockets are properly connected on the power busbars, checkwhether the release come on when there is a voltage on the power input terminals and the CB is open and without any Vaux.If is not the case, there is no guaratee that the unit will function when powered from the busbar voltages without any Vaux.Contact ABB SACE.1/6CB openAuto TestTrip Test (disabled)CB statusTest