Section 2 Relay engineering processPCM600 is used for various tasks in the protection relay engineering process.• Relay engineering management• Organizing the bay protection relays in the structure of the substation bydefining voltage levels and bays below the substation. PCM600 managesthe project.• Configuring the protection relay functions (for example, protection andcontrol functions) by using the Application Configuration tool.• Configuring the parameters and setting values for the protection relay itselfand for the process functions by using the Parameter Setting tool.• Drawing single-line diagrams and making links to dynamic process valuesby using Graphical Display Editor. The single-line diagrams are displayedin LHMI and WHMI on the bay protection relay.• Configuring connections between the application configuration functionblocks and physical hardware inputs and outputs by using the Signal Matrixtool or the Application Configuration tool.• Configuring the events shown on the LHMI using the HMI Event Filteringtool.• Reusing configurations from older protection relay versions using theConfiguration Migration tool.• Communication management• IEC 61850 station communication engineering is done using the internalIEC 61850 Configuration tool or the separate IET600. PCM600 interactswith IET600 by importing and exporting SCL files.• Configuring the GOOSE receiving data connections to the protectionrelay's application configuration function blocks by using the ApplicationConfiguration tool and the Signal Matrix tool.• Configuring protocol data mapping for IEC 60870-5-101/104, Modbus orDNP3 with the Communication Management tool.• Configuring the sampled values (process bus) between the devices usingthe Application Configuration tool and IEC 61850 Configuration tool.• Record management• Generating overviews on the available (disturbance) recordings in allconnected protection relays by using the Disturbance Handling tool.• Manually reading the recording files (in the COMTRADE format) from theprotection relays by using the Disturbance Handling tool or automaticallyby using the PCM600 Scheduler.• Managing recording files with the Disturbance Handling tool.1MRS757810 C Section 2Relay engineering processREC615 and RER615 15Engineering Manual