ContentsAcano solution: Installation Guide 76-1002-04-D Page 2Contents1 Introduction ....................................................................................................................... 31.1 Before You Start ................................................................................................................ 31.1.1 Safety information .................................................................................................... 31.1.2 You will need the following equipment...................................................................... 32 The Acano Server ............................................................................................................. 52.1 PIN Outs for Console Port ................................................................................................. 62.2 Status Light Descriptions ................................................................................................... 62.2.1 Front panel LEDs ..................................................................................................... 62.2.2 Back panel LEDs...................................................................................................... 63 Hardware Installation......................................................................................................... 84 Network Configuration ..................................................................................................... 114.1 Creating an Administrator Account .................................................................................. 114.2 Setting up the Network Interfaces for IPv4 ...................................................................... 124.3 Creating the Web Admin Interface Certificate .................................................................. 134.4 Configuring the Web Interface for HTTPS Access ........................................................... 15Appendix A DC Power Option – Wiring and Safety ............................................................... 16Location ........................................................................................................................... 16Wiring 16Overcurrent protection...................................................................................................... 16FiguresFigure 1: Acano Server front panel .............................................................................................. 5Figure 2: Acano Server back panel with power units installed ..................................................... 5Figure 3: Fitting inside rail components to the Acano Server sides .............................................. 8Figure 4: Cage nut locations for the rack rails.............................................................................. 9Figure 5: Location of the red button ........................................................................................... 11