IntroductionAcano solution: Installation Guide 76-1002-04-D Page 31 IntroductionFollow this guide to fit the Acano Server into a rack, fit the power supplies, connect the cables,and power up. It also tells you how to achieve basic network connectivity with the Acano solutionRelease 1.1 software. See the Deployment Guide for other set up and configuration information.1.1 Before You Start1.1.1 Safety informationWARNING: Read the information at www.acano.com/safety. There you will findessential safety information to protect you and the equipment. The Acano Server weighs approximately 23 kg / 51 lbs.Do not attempt to lift it on your own at any time.Do not place it on top of any other equipment.Do not support it on the rack ears alone; they are not designed to be load-bearing. The power units do not have an on/off switch; the server will power on as soon as power isconnected. Therefore do not do so until instructed. DC power option only: See Appendix A for additional safety information.1.1.2 You will need the following equipmentThe Acano Server comes with most of the components you need.The shipping box contains: One Acano Server A box containing two power supplies A box containing power cables for various countries, a serial cable, two rack ears andaccessoriesNote: If you are using AC power and none of the supplied power cables are approved foryour location, you will need to provide them. A box containing two rack rails. (These rails are not left- or right-handed but are packed inthe correct installation orientation relative to the Acano Server so be sure to maintain thecorrect orientation from back to front.)However, you must provide the following: A 2U space in a 4-post rack