3-2 Mechanical Installation AXIOM™ 400 Product ManualAccu-Sort Systems, inc. 03-AXIOM400-Mechanical_Installation_R10.docInstallation Sequence(s)USEFUL TIP: Everything should be MECHANICALLY INSTALLED beforeperforming any ELECTRICAL INSTALLATION. Reference Chapter 4 forelectrical installation details.Installing a Single UnitTo install a single unit, follow this sequence of steps: Complete mechanical installation. Review the details of your application’s requirements. Determine and mark the reader mounting location. Erect mounting frame or other supporting structures. Attach the Universal Mounting Bracket (UMB) or X-ScanningMounting Bracket (XMB) to the frame. (UMB, XMB, and mountingframe options are available from Accu-Sort.) Mount the wiring base to the UMB, XMB, or frame. Mount the Accu-Sort power supply to the UMB or XMB (optional). Mount trigger (optional). (See page 3-14.) Mount tachometer (optional). (See page 3-15.) Mount I/O modules (optional). (See page 3-16.) Complete electrical installation. See Chapter 4.NOTE: To reduce the possibility of damage to the scan head, install it afterthe wiring base is mounted, wired, and all wiring is checked for accuracy. Besure to perform the polarity check before attaching the scan head. Setup your Axiom. See Chapter 5. Check operations. See Chapter 5.Installing multiple unitsTo mechanically install multiple units, follow the same sequence of steps, perAxiom reader, as defined in Installing a Single Unit. Your application will definehow the mounting requirements vary for each reader.Multiple-reader networks may require a different approach to physical locationof the power source, trigger photoeye, and tachometer since they are mostlikely being shared by the group of readers.