USER MANUAL 11____________________________________________________________________________________________________________________8. Preparing balance to work1. Take the balance, the feeder andmechanical elements of the pan out. It isrecommended to keep the original scalepackage in order to transport thebalance safely in future.2. Place the balance on a stableground not affected by mechanicalvibrations and airflows.3. Level the balance with rotating legs6 so that the air bubble in water level 7at the back of the balance is in themiddle.4. (for AGC100-AGC600) Gently insertthe mandrel of pan support 2 intobalance mechanism socket through thepan ring 3 and the pan 1 on (AGC600balances have not pan ring).5. (for AGC1000-AGC4000, AGZ10C)Place nuts 2 on mandrels that are visiblein balance cover holes, put the pan 1 onnuts.If the balance was taken from a lower temperature surrounding to a room withhigher temperature, e.g. in winter, moisture can liquefy on the balance casing.Do not connect power supply to the balance, because this can cause damageor improper work of the balance. In this case leave the balance for at least 4hours unplugged for acclimatization.761 2 37612