W W W . B A L T I M O R E A I R C O I L . E URIGGINGUnloading of Equipment1. The equipment arrives on site by truck.It is recommended to unload the unit with a crane. The Adiabatic Pre-Cooling Sections for the TrilliumSeriesare crated separately. A forklift should be used for unloading of the crate with Adiabatic Pre-Coolers.A crane must always be used to unload the unit from the truck. Do not attempt to unload the unit using a forklift.2. Spreader bars of the full width of the section must be used between the lifting cables to prevent damage to thesection.3. For extended lifts or where hazards exist, it is recommended to use the lifting devices in conjunction withsafety slings placed under the unit.4. For each unit, only one lift is required. Lifting ears are foreseen on each unit.5. Attach the lifting devices to the unit at the four corners as per rigging methods below. Do not use lifting hooks tolift the unit, use shackles as shown on below picture. Unload the unit from the truck.CautionBEFORE AN ACTUAL LIFT IS UNDERTAKEN, ENSURE NO WATER, SNOW, ICE OR DEBRISHAS COLLECTED IN THE UNIT. SUCH ACCUMULATIONS WILL ADD SUBSTANTIALLY TO THEEQUIPMENT'S LIFTING WEIGHT.Use shackles to lift the unit6. Install the unit in its final position and anchor to the support beams (supplied by others).10DCVDCV-AD33 Rigging3 Rigging