12 | Cannon Fitzroy / Canterbury Inbuiltfitzroy & Canterbury inbuilt flueingTransition rectangular to 100mm round.(supplied as standard)The flue must be fixed in place.Ø100mm flueHeaterInstall heateronto a solid,leveled base.Roof cladding500mm between top ofcowl and nearest part ofroof. (Also refer to AS5601)Flue cowlapproved toAG604Flue clampFlashingFit two lengths of vertical flue (1.8m) before fittingany 45° bends. If bends are used, fit inside of fluepipe. Use no more than two 45° bends in the totalflue run and maintain at least 250mm of straightflue pipe between the bends.fig 7 this diagram is a general guide only.Please note: flueing of heater Mustbe carried out by an authorised person.refer to australian standard gasinstallations as 5601.installing a flue on the shorter wall maysubject it to down draughts or reverseair flows through the heater which canbe difficult to find a solution to. alwaysadopt correct flue design practices.refer to australian standard gasinstallation as 5601 for ‘location offlue terminal’.the heater has been tested and shouldoperate satisfactorily with an optimumflue length of 4.5 meters.exceeding this length may affect thestability of the flame pattern and theoperation of the heater. Contact ourtechnical support department if anyfurther advice is required.flue installation