Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.Catalog No. 04-53300091-01 Printed in U.S.A. Form 30XA-4T Pg CL-1 612 10-11 Replaces: 30XA-3TSTART-UP CHECKLIST FOR 30XA LIQUID CHILLERSA. PROJECT INFORMATIONJob Name ______________________________________Address ________________________________________City __________________ State ________ Zip ________Installing Contractor_______________________________Sales Office _____________________________________Start-up Performed By _____________________________Design InformationUnitModel _______________________________________ Serial ______________________________________CompressorsCompressor AModel _______________________________________ Serial ______________________________________Compressor BModel _______________________________________ Serial ______________________________________Compressor CModel _______________________________________ Serial ______________________________________CoolerModel _______________________________________ Serial ______________________________________B. PRELIMINARY EQUIPMENT CHECK (This section to be completed by installing contractor)1. Is there any physical damage? Yes NoWill this prevent start-up? Yes NoDescription__________________________________________________________________________________________2. Unit is installed level as per the installation instructions. Yes No3. Power supply agrees with the unit nameplate. Yes No4. Correct control voltage ________vac. Yes No5. Electrical power wiring is installed properly. Yes No6. Unit is properly grounded. Yes No7. Electrical circuit protection has been sized and installed properly. Yes No8. All terminals are tight. Yes No9. All plug assemblies are tight. Yes No10. All cables, thermistors and transducers have been inspected for cross wires. Yes No11. All thermistors are fully inserted into wells. Yes No12. Oil separator heaters energized for 24 hours before start-up. Yes No13. Relief valve vent piping per local codes. Yes NoChilled Water System Check1. All chilled water valves are open. Yes No2. All piping is connected properly. Yes No3. All air has been purged from the system. Yes No4. Chilled water pump is operating with the correct rotation. Yes No5. Chilled water pump starter controlled by chiller. Yes No6. Chilled water flow switch operational. Yes No7. Inlet piping to cooler includes a 20 mesh strainer. Yes No8. Water loop volume greater than 3 gal/ton (40 L/kW) for air conditioningor 6 gal/ton (80 L/kW) for process cooling and low ambient operation. Yes No9. Proper loop freeze protection provided to ____ F (C).Antifreeze type__________________ Concentration _____%. Yes No(If antifreeze solution is not utilized on 30XA machines and theminimum outdoor ambient is below 32 F (0 C) then items 10 and 11have to be completed to provide cooler freeze protection to –20 F (–28.9 C).Refer to Installation Instructions for proper cooler winterization procedure.)10. Outdoor piping wrapped with electric heater tape. Yes No11. Cooler heaters installed and operational. Yes No12. Is the Unit equipped with low ambient head pressure control? Yes Noa. If yes, are wind baffles installed? Yes NoCAPACITY EWT LWT FLUID TYPE FLOW RATE P.D. AMBIENTCooler