-26- Userās ManualInstallation requirements:The ceiling must be firm enough to bear 4 times theweight of the speed dome.Pendent MountUpper housingPan/tilt moduleBlack linerDown coverUpper housingPan/tilt moduleDown cover1 Mark screws positionsTake the bracket base as the template to mark thescrews positions on the wall, and then drill the holesto insert expansion screws.NOTE: there are two kinds of pan/tilt modules availableas the left picture illustrated. The user should be awareof the differences of two pan/tilt modules during theinstallation.