• Split Sky Air • Indoor Units 7• Indoor Units • Cooling Only/Heat Pump • FCQH-D8VEB5 Dimensional drawing & centre of gravity5 - 2 Dimensional drawing with auto cleaning panelFCQH71D8VEB3TW32524-1NOTESLocation of the nameplates:Unit body: on the control box.Decoration panel: on the panel frame at the motor side under thecorner coverWhen installing an optional accessory, refer to the installation drawings.For the fresh air intake kit an inspection part is necessaryMake sure the spacing between the ceiling and the cassette is no morethan 35mm. Max. ceiling opening: 910mmWhen the conditions exceed 30°C and RH 80% in de ceiling or freshair is included into the ceiling, an additional insulation is required(polyethylene foam, thickness 10mm or more).1.••2.•3.4.Nr Name Description1 Liquid pipe connection Ø9.5 flare connection2 Gas pipe connection Ø15.90 flare connection3 Drain pipe connection VP25 (O.D.Ø32, I.D. Ø25)4 Power supply entry hole5 Transmission wiring entry hole6 Air discharge opening7 Air suction grille8 Corner decoration cover9 Drain hose O.D.Ø32, I.D. Ø2610 Knock out holePiping sideDrain sideVIEW AHanging bolt4 x M8~M10 Adjustable (0~675)710 (Suspension position)300 or less860~910 (Ceiling opening)780 (Suspension position)860~910 (Ceiling opening)See note 3See note 3 See note 31500 or more(Installation space)VIEW BPlease respect the distances as shown on figure below6.Installation direction5.Piping PipingDustopeningSuctiongrillExternalsurfacelight (*1)(*3)Ventilator Other unit2561500 or more2000 or more4000 or more(*1) Does not count for build in light(*2) Space needed to enter with vacuum-cleaner tube.(*3) Keep the exhaust of decoration panel free.1500mm ormore (*4)200mm ormore (*4)1500mm ormore (*4)200mm ormore (*4) 1500mm ormore (*4)1500mm ormore (*4)(*4) In case a discharge opening is closed with the ‘sealing member’ option,the distance of 1500mm can be reduced to 500 mm on the closed side.FCQH100-140D8VEB3TW32544-1NOTESLocation of the nameplates:Unit body: on the control box.Decoration panel: on the panel frame at the motor side under thecorner coverWhen installing an optional accessory, refer to the installation drawings.For the fresh air intake kit an inspection part is necessaryMake sure the spacing between the ceiling and the cassette is no morethan 35mm. Max. ceiling opening: 910mmWhen the conditions exceed 30°C and RH 80% in de ceiling or freshair is included into the ceiling, an additional insulation is required(polyethylene foam, thickness 10mm or more).1.••2.•3.4.Nr Name Description1 Liquid pipe connection Ø9.52 flare connection2 Gas pipe connection Ø15.90 flare connection3 Drain pipe connection VP25 (O.D.Ø32, I.D. Ø25)4 Power supply entry hole5 Transmission wiring entry hole6 Air discharge opening7 Air suction grille8 Corner decoration cover9 Drain hose O.D.Ø32, I.D. Ø2610 Knock out holePiping sideDrain sideVIEW AHanging bolt4 x M8~M10 Adjustable (0~675)710 (Suspension position)300 or less860~910 (Ceiling opening)780 (Suspension position)860~910 (Ceiling opening)See note 3See note 3 See note 31500 or more(Installation space)VIEW BPlease respect the distances as shown on figure below6.Installation direction5.Piping PipingDustopeningSuctiongrillExternalsurfacelight (*1)(*3)Ventilator Other unit2561500 or more2000 or more4000 or more(*1) Does not count for build in light(*2) Space needed to enter with vacuum-cleaner tube.(*3) Keep the exhaust of decoration panel free.1500mm ormore (*4)200mm ormore (*4)1500mm ormore (*4)200mm ormore (*4) 1500mm ormore (*4)1500mm ormore (*4)(*4) In case a discharge opening is closed with the ‘sealing member’ option,the distance of 1500mm can be reduced to 500 mm on the closed side.