34008097EN/AE - Page 142. InstallationHotSwap MBP-module operationUPS start-up with the HotSwap MBP module1 - Check that the UPS is correctly connected to the HotSwap MBP module.2 - Set switch (53) to the Normal position.3 - Start the UPS by pressing the ON/OFF button (27) on the UPS control panel.The load is supplied by the UPS.LED (51) "UPS ON - OK to switch" on the HotSwap MBP module goes ON.HotSwap MBP-module test1 - Set switch (53) to the Bypass position and check that the load is still supplied.2 - Set switch (53) back to the Normal position.2.8 UPS connection without a FlexPDU or HotSwap MBP moduleThe HotSwap MBP module has a rotaryswitch (53) with two positions:Normal - the load is supplied by the UPS,Bypass - the load is supplied directly bythe AC-power source.Check that the indications on the name plate located on the back of the UPS correspond to the AC-power sourceand the true electrical consumption of the total load.Tower model1 - Connect the UPS socket (9) to the AC-power source using the power cable fromthe equipments to be protected.2 - Connect the loads to the UPS using thecables (32).It is preferable to connect the priority loadsto the 3 outlets marked (8) and the non-priority loads to the 3 outlets marked (7)that can be programmed in pairs (1 and 2).To program the outlets, the EATONcommunications software is required.RT modelNote. The UPS charges the battery as soon as it is connected to the AC-power source, even if button (27) is notpressed.Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery cansupply the rated backup time. !"#$%&'()