68 30-200 kW P-164000249User's and Installation Guide Revision 26.5.3 Enabling and disabling the battery chargerTo turn the battery charger on or off, perform the following procedure:1. Press the Controls button in the main menu. The System controls screen appears.2. On the System controls screen, press UPS controls.3. Press the Start charger / Stop charger button.6.6 UPM control instructions6.6.1 Starting the UPMsMake sure that load level does not exceed single UPM capacity.To start an individual power module in double conversion mode:1. Unfasten the front door latch and swing the door open.2. Verify that rectifier input switches are closed if included inside the UPS system, and verify thatbattery breaker is closed, and close the front door.3. Close the UPS input feeder circuit breaker.4. Close the UPS Bypass input feeder circuit breaker.5. Observe the UPS control panel becoming active, indicating logic power.6. Press the Controls button in the main menu. The System controls screen is displayed.7. On the System controls screen, the UPS status should indicate SHUTDOWN.8. Verify no alarms are active.9. On the System controls screen, press Module controls. Select module screen is displayed.10. Select the UPM you want to start (UPM 1 - UPM 4).11. The UPM control screen is displayed and the UPM status should indicate SHUTDOWN.12. On the UPM control screen, select Start module.13. Verify the following messages display sequentially on the UPM status line:READYACTIVEThe UPM rectifier and inverter turn on and the UPM will transfer to double conversion modeand supply the critical load.6.6.2 UPM shutdownA single UPM in the system can be shut down only if it is redundant. In practice that means a UPMis not allowed to be shut down if doing so would lead to an overload condition in the remaining UPMsor UPSs in the system.To shutdown a single UPM:1. Press the Controls button in the main menu. The System controls screen is displayed.2. On the System controls screen, press Module controls. Select module screen is displayed.3. Select the UPM you want to shut down (UPM 1 - UPM 4).