Product informationIntroductionEaton's Cooper Power™ series 600 A, 15 and 25 kV ClassCleer™ loadbreak standoff bushing meets the applicablerequirements of IEEE Std 386™ standard, "SeparableInsulated Connector Systems" and provides doubleinterfaces for temporarily parking its Cooper Power seriesCleer loadbreak connector in sectionalizing cabinets and inunderground vaults. The standoff bushing is designed to beinstalled in the parking stand of the sectionalizing cabinet orin a parking stand mounted in a vault.Read This Manual FirstRead and understand the contents of this manual andfollow all locally approved procedures and safety practicesbefore installing or operating this equipment.Additional informationThese instructions cannot cover all details or variationsin the equipment, procedures, or process described norprovide directions for meeting every possible contingencyduring installation, operation, or maintenance. For additionalinformation, contact your Eaton representative.Acceptance and initial inspectionEach Cleer standoff bushing is in good condition whenaccepted by the carrier for shipment. Upon receipt, inspectthe shipping container for signs of damage. Unpack thestandoff bushing and inspect it thoroughly for damageincurred during shipment. If damage is discovered, file aclaim with the carrier immediately.Handling and storageBe careful during handling and storage of the standoffbushing to minimize the possibility of damage. If the stand-off bushing is to be stored for any length of time prior toinstallation, provide a clean, dry storage area.Quality standardsISO 9001 Certified Quality Management SystemFigure 1. 600 A, 15 and 25 kV Class Cleer loadbreakstandoff bushing (parking stand version shown).WARNINGHazardous Voltage. All associated apparatus must bede-energized during any hands-on installation or main-tenance. Failure to comply could result in death andsevere personal injury.CAUTIONThe 600 A, 15 and 25 kV Class standoff bushings aredesigned to be operated in accordance with normalsafe operating procedures. These instructions are notintended to supersede or replace existing safety andoperating procedures.The standoff bushing should be installed and servicedonly by personnel familiar with good safety practicesand the handling of high-voltage electrical equipment.1CLEER LOADBREAK STANDOFF BUSHING INSTALLATION INSTRUCTIONS MN650021EN March 2016