UPS CABINET INSTALLATIONEaton FERRUPS Rack Mount UPS (850 VA–7 kVA) Installation Guide 164201425 Rev 1www.eaton.com/powerquality4810. Verify the slide rails and latches work properly by sliding the UPScabinet out approximately 18 (46 cm) until the rail latches lock.Press the rail tabs and slide the UPS cabinet all the way back intothe rack. The cabinet should move smoothly.C A U T I O NTo prevent electric shock or damage to your equipment, verify that the UPS ON/OFF switch isin the OFF position before removing the cover.11. Remove the UPS top cover (see Figure 30).Figure 30. Removing the UPS Top Cover12. Continue to one of the following sections according to your UPSconfiguration: If you have a hardwired UPS, continue to “Electrical Installation”on page 49. If you have a plug-receptacle UPS with a battery cabinet,continue to “Battery Wiring” on page 69. If you only have a plug-receptacle UPS cabinet, use bolts toattach the UPS front panel to the rack and continue to thestartup section in the Eaton FERRUPS Rack Mount UPS(850 VA–7 kVA) User's Guide.