Page 14 TD 17558Effective 3/98Display Module Cut a ¼ DIN (92mm x 92mm) access cutout in the switchgear dooror other panel where the IQ 200 is to be mounted as shown in figure 3.1. Install theIQ 200 Display Module as shown in figure 3.1, followin g these steps:• Install the supplied gasket when using in NEMA 12 applications.• Slide the supplied gasket over the rear of the IQ 200 Display Module until it isflush with the rear of the outer bezel.• Insert the IQ 200 Display Module with gasket installed into the cutout.• Slide the 4 supplied locking bars into the 4 slots in the top, bottom, and sides atthe rear of the IQ 200 Display Module• Insert and tighten the supplied thumbscrews to secure the IQ 200 DisplayModule in place.Connect the grounding terminal on the rear face of the IQ 200 Display Module toearth ground.Base Module Select a location forthe IQ 200 Base Module.Depending on the location, usethe mounting holes in the flangeon the front face of the IQ 200Base Module, the suppliedL-bracket, or the DIN rail/DIN clipset to secure the IQ 200 BaseModule in the desired location andorientation. Typical mountingoptions are shown in figure 3.3.The hole drilling pattern formounting the IQ 200 Base Moduleto floor, wall, or other surface isshown in figure 3.4.Figure 3.3 Typical Mounting Options forMounting the IQ 200 Base ModuleConnect the IQ 200 Base Module to earth ground using the grounding terminal onthe rear face.Route a Category 5 cable from the IQ 200 Base Module to the IQ 200 DisplayModule. Do not route the Category 5 cable in the same enclosure or cable tray as600V system wiring.