INSTALLATIONEATON Powerware® 9125 Two-in-One PDM (5000/6000 VA) User’s Guide S 164201519 Rev Ewww.powerware.com22Table 1. Hardwired PDM Input/Output Voltage SettingsPPDM HW Models Output VoltageInput Voltage(from UPS) 208V Switch Position Default 240V Switch Position(from UPS)HV LV HV LV208 208 120 208 104220 220 126 220 110230 230 131 230 115240 240 138 240 120PPDM EURO HW Models Output VoltageInput Voltage(from UPS) 230V Switch Position Default 240V Switch Position(from UPS)HV LV HV LV220 230 115 220 110230 240 120 230 115240 250 125 240 1206. Remove the wiring access cover and the conduit landing plate andretain (see Figure 10).Punch holes in the conduit landing plate for the input and outputconduit using a Greenlee ® punch or similar device.7. Pull the input and output wires through separate conduit, leavingapproximately 0.5m (2 ft) of exposed wire. Attach a flexible metalfitting to the end of each conduit.8. Insert each conduit through a wiring access entry and attach theconduit fitting to the panel. Strip 9 mm (0.35I) of insulation fromthe end of each incoming wire.