Installing the IAC-D3-2 EATON Powerware® 9390 IAC-D Installation and Operation Manual S 164201591 Rev B powerware.com2. Unfasten the front door latch and swing the door open (see Figure 3-1).3. Remove the door. Remove the retaining screws located inside the door at the topand bottom hinge pivot points, then lift the door off. Save the retaining screws forreinstallation of the door.4. If the leveling feet are not fully retracted, turn the leveling feet until they areretracted.5. Remove the two bolts securing the front shipping bracket to the pallet (seeFigure 3-1). Do not remove the four bolts securing the bracket to the cabinet.6. Remove the four bolts securing the rear shipping bracket to the cabinet and thetwo bolts securing the bracket to the pallet (see Figure 3-2). Remove the rearshipping bracket. If installing the cabinet permanently, retain the shipping bracketand securing hardware for later use.7. Remove the three rear skid bolts securing the removable skid and remove the skid(see Figure 3-2).NOTE In the following step the pallet will tilt and act as a ramp when the cabinet isrolled beyond the the center of the pallet. Be sure to restrain the cabinet as it continuesto roll down the pallet/ramp. The front shipping bracket will act as a brake to assistrestraining the cabinet.W A R N I N GDo not stand directly behind the pallet while unloading the cabinet. If unloading instructionsare not closely followed, the cabinet may cause serious injury.8. Slowly roll the cabinet toward the rear of the pallet. Once the pallet tilts, continuerolling the cabinet down the pallet until the cabinet is clear of the pallet.9. Remove the four bolts securing the front shipping bracket to the cabinet (seeFigure 3-1). Remove the front shipping bracket. If installing the cabinetpermanently, retain the shipping bracket and securing hardware for later use.10. Discard or recycle the pallet and unused shipping brackets in a responsiblemanner.11. Roll the cabinet to its final installation location.12. Proceed to paragraph 3.3.