Installing the IDC3-2 EATON Powerware® 9390 IDC Installation and Operation Manual S 164201560 Rev C www.powerware.com1. If not already accomplished, use a forklift or pallet jack to move the cabinet to theinstallation area, or as close as possible, before unloading from the pallet. Insertthe forklift jacks between the skids on the bottom of the unit.NOTE Verify that the forklift or pallet jack is rated to handle the weight of the cabinet(see Table A on page A-4 for cabinet weight).2. Unfasten the front door latch and swing the doors open (see Figure 3-1).3. Remove the doors. Remove the retaining screws located inside each door at thetop and bottom hinge pivot points, then lift the door off. Save the retaining screwsfor reinstallation of the doors.4. If the leveling feet are not fully retracted, turn the leveling feet until they areretracted.5. Remove five bolts securing the front shipping bracket to the cabinet and five boltssecuring the bracket to the pallet (see Figure 3-1). Remove the front shippingbracket. If installing the cabinet permanently, retain the shipping bracket andsecuring hardware for later use.6. Remove five bolts securing the rear shipping bracket to the cabinet and five boltssecuring the bracket to the pallet (see Figure 3-2). Remove the front shippingbracket. If installing the cabinet permanently, retain the shipping bracket andsecuring hardware for later use.7. Remove the front skid bolt (Figure 3-1) and the rear skid bolt (Figure 3-2) securingthe removable skid, and remove the skid.NOTE In the following step the pallet will tilt and act as a ramp when the cabinet isrolled beyond the the center of the pallet. Be sure to restrain the cabinet as it continuesto roll down the pallet/ramp.W A R N I N GDo not stand directly to the right side of the pallet while unloading the cabinet. If unloadinginstructions are not closely followed, the cabinet may cause serious injury.8. Slowly roll the cabinet toward the right side of the pallet. Once the pallet tilts,continue rolling the cabinet down the pallet until the cabinet is clear of the pallet.9. Discard or recycle the pallet and unused shipping brackets in a responsiblemanner.10. Roll the cabinet to its final installation location.11. Proceed to paragraph 3.3.