Installing the UPS System3-5EATON Powerware® 9390 UPS (20–80 kVA) Installation and Operation Manual S 164201603 Rev 1 www.powerware.comNOTE In the following step the pallet tilts and acts as a ramp once the cabinet is rolledbeyond the the center of the pallet. Be sure to restrain the cabinet as it continues to rolldown the pallet/ramp.W A R N I N GDo not stand directly behind the pallet while unloading the cabinet. If unloading instructionsare not closely followed, the cabinet may cause serious injury.8. Slowly roll the cabinet toward the rear of the pallet. Once the pallet tilts, continuerolling the cabinet down the pallet until the cabinet is clear of the pallet.9. Roll the cabinet to the final installation location.10. If installing the cabinet permanently, retain the shipping brackets and hardware;otherwise, discard or recycle the pallet and rear bracket in a responsible manner.11. If permanently mounting the system, proceed to Step 15; otherwise, continue toStep 12.W A R N I N GThe front anti-tip/shipping bracket must be reinstalled; otherwise, injury and damage to theUPS may result when removing components during service. If the bracket is not reinstalled, thecabinet may tip and cause serious injury and damage.12. Secure the UPS cabinet in position by lowering the leveling feet until the cabinet isnot resting on the casters and the cabinet is level.13. Using the retained hardware, reinstall the front anti-tip/shipping bracket (bracketwith wider base) removed in Step 6 to the front of UPS cabinet with the anglefacing outward and adjusted level with the floor (see Figure 3-1).14. If installing battery and distribution cabinets, proceed to paragraphs 3.2.2 and3.2.3; otherwise, proceed to paragraph 3.2.6.15. Using the retained hardware, reinstall the shipping brackets removed in Step 5 tothe front and rear of the UPS cabinet with the angle facing outward (seeFigure 3-1 and Figure 3-2).16. Secure the cabinet to the floor with contractor-supplied hardware.17. If installing battery and distribution cabinets, proceed to paragraphs 3.2.2 and3.2.3; otherwise, proceed to paragraph 3.2.6.3.2.2 Battery Cabinet InstallationTo install the battery cabinet, refer to the Powerware 9390 Integrated Battery Cabinet(Models IBC-S and IBC-L) Installation Manual. After the battery cabinet is installed, returnto paragraph 3.2.6 to wire the UPS and battery cabinet.