MBM INSTALLATIONEaton 9395 Maintenance Bypass Module Installation and Operation Manual 164201719 Rev 3 www.eaton.com/powerquality 4-194.3.4 Standalone Cabinet InstallationTo install an MBM located separately from the Eaton 9395 UPS cabinet (seeFigure 4‐16 and Figure 4‐17):1. Verify that the UPS is properly installed and secured. Refer to the applicableEaton 9395 Installation and Operation manual listed in paragraph 1.7 on page 1-4for installation instructions.2. Using a forklift, move the MBM cabinet to the final installed location.3. Carefully lower the MBM cabinet until the cabinet base contacts the floor.4. Unfasten the MBM front door latch and swing the doors open (see Figure 4‐1 onpage 4-2).5. Remove the door by removing the retaining screws located inside the door at thetop and bottom hinge pivot points, then lift the door off. Save the retainingscrews for reinstallation of the door.6. Remove the screws securing the top and bottom internal safety shield panels,and remove the panels to gain access to the inside of the cabinet.7. If permanently mounting the system, proceed to Step 8; otherwise, continue toStep 10.8. Using the retained hardware, reinstall the shipping brackets removed inparagraph 4.2, Steps 2 and 3 to the left and right sides of the MBM cabinet withthe angle facing outward (see Figure 4‐1 and Figure 4‐2).9. Secure the cabinet to the floor with customer-supplied hardware.10. Proceed to paragraph 4.3.5.