MBM INSTALLATIONEaton 9395 Maintenance Bypass Module Installation and Operation Manual 164201719 Rev 3 www.eaton.com/powerquality 4-254.5 Completing the Installation ChecklistThe final step in installing the MBM is completing the following Installation Checklist.This checklist ensures that you have completely installed all hardware, cables, andother equipment. Complete all items listed on the checklist to ensure a smoothinstallation. Make a copy of the Installation Checklist before filling it out, and retain theoriginal.After the installation is complete, an Eaton Customer Service Engineer must verify theoperation of the UPS system and MBM, and commission it to support the critical load.The service representative cannot perform any installation tasks other than verifyingsoftware and operating setup parameters. Service personnel may request a copy ofthe completed Installation Checklist to verify all applicable equipment installationshave been completed.NOTE The Installation Checklist MUST be completed prior to starting the UPS system and MBM for thefirst time.Installation Checklist All packing materials and restraints have been removed from each cabinet. The MBM is placed in its installed location. A cabinet grounding/mounting kit is installed between any cabinets that are bolted together. All conduits and cables are properly routed to the MBM. All power cables are properly sized and terminated. Neutral conductors are installed or bonded to ground per requirements. A ground conductor is properly installed. All interface wiring is properly routed to the MBM. All interface wiring is properly sized and terminated. MBP, MIS, BIB, and RIB current settings are correct. Air conditioning equipment is installed and operating correctly. The area around the installed MBM is clean and dust‐free. (It is recommended that the MBM be installed on a levelfloor suitable for computer or electronic equipment.) Adequate workspace exists around the MBM. Adequate lighting is provided around the MBM. A 120 Vac service outlet is located within 7.5 meters (25 feet) of the MBM. The debris shield covering the MBM cabinet ventilation grill is removed. Startup and operational checks are performed by an authorized Eaton Customer Service Engineer.