Part 15 Start Up ChecklistLight Up Activities Date Completed1)Verify piping Verify all piping and gas connections aresecure and tightcompleted2) Pressurizeboiler and systemUse manual fill valve (white knob at bottomleft of boiler) by turning it open (clockwiseturn) or if relying on PRV to pressurizesystem, open it until boiler pressure reaches1.5 barcompleted3)Check gas pipe Leak test using approved local methodsCheck incoming gas pressure. Ideal pressureis 8 to 10”In. wc StaticWhat is the “drop” on light off(no more than 1”wc)In. wc Dynamic4)CondensatecupFill condensate cup half way with water andensure it is inserted fully and twisted tosecure fullycompleted5)Propane(if using)See page 53 and 54 to change boiler settingfrom NG to LP. If using H200 or C200, mustchange gas pipe on these models ONLYcompleted5)Calibrate theboiler **THISSTEP ISESSENTIAL**See page 60 and 61 of manual forinstructions. If done manually, note flameionization number used to get 9% CO2% CO2 High Fire %CO2 Low Fire6)Record SystemsettingsSee page 53 and 54 to change boilersettings. Record changed settings6.5)Changedomestic hotwater settingIf using an indirect tank with H model boiler,setting 11 must be changed to “02” to letboiler know tank is presentcompleted7)Confirm systemoperationTurn up thermostat to verify wiringconnections. Ensure boiler fires uponthermostat call for heatcompleted8)WarrantyregistrationMail in warranty registration form or registeronline at www.ecokingheating.com. Navigateto boiler page and follow linksTable 15.1 Start Up Checklist73