ENgLIsh266 - START UP1 Steam tap2 Atomizer pipe3 Water supply tap4 Hot water supply5 Tank cover6 Boiler manometer7 Pilot light for machine on8 Tank9 Main switch10 Button- 1 strong coffee (GD)11 Button -2 strong coffees (GD)12 Button- 1 weak coffee (GD)13 Button -2 weak coffees (GD)14 Delivery / Stop Button (GD)15 Coffee control switch (GE)16 Power supply cable17 Level pilot light for lack of water in tank(GE version only)18 Coffee switch pilot light (GE)After completing the machine preparation, proceed to the start up.Position the machine main switch (9) to position the ma-chine on indicator will come on (7).- The auto-levelling device will come into operation.Only during the first loading, this operation can take quite a longtime and make the machine stop; in this case switch off the machineand switch it on again by acting on the main switch (Fig.6.01-pos.9).- Then wait until the machine reaches the operating pressure of “1,2- 1,3 BAR” by checking the boiler pressure on the manometer(Fig.6.01-pos.6).- The machine is now ready for use.ABFig.6.02Warning !!When the machine is new the filter-holder sump may not bealigned (perpendicular to the machine itself) as shown in thefigure at the side, however this does not effect the efficientfunction of the same.After a short period of use the sump will gradually settle intoa correct position.A = Position of closed filter-holder with new machine.B = Position of closed filter holder with machine after a short periodof use.16mod. GDmod. GE10 11 12 13 1415 185 89314726917Fig.6.01Note: Options include shower head gaskets that are thinner (8.1 mm,part no. NG01/005) or thicker (9.0 mm, part no. NG01/002) than thestandard shower head gasket (8.5 mm, part no. NG01/001/B).