Contents - installation manual
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- G3X Installation Overview
- System Overview
- General G3X LRU Specifications
- G3X LRU Physical Specifications
- Installation Requirements
- Pin Contact and Crimp Tools Part Numbers
- Coaxial Cable Installation
- Section 1 1-1 –
- Equipment Description
- Electrical Specifications
- Environmental Specifications
- GDU 37X Mounting Accessories
- Installation Considerations
- Section 2 2-1 –
- GMU 44 Unit View
- GMU 44 TSO/ETSO Compliance
- GMU 44 Part Numbers
- Required Distance from Magnetic Disturbances
- GSU 73/GMU 44 Interconnect Harness Fabrication Instructions
- Section 3 3-1 –
- GSU 73 Unit View
- GSU 73 Supply Specifications
- GSU 73 Environmental Specifications
- Contents of P732 Connector Kit (011-01818-01)
- GSU 73 Air Hose Fitting Locations
- Mounting Requirements
- Unit Installation
- Section 4 4-1 –
- GTP 59 Part Number
- TSO/ETSO Compliance
- Parts Needed for GTP 59 Installation
- Section 5 5-1 –
- Garmin GPS/XM Antennas
- Antenna Mounting Considerations
- Recommended Antenna Placement
- Carbon/Glass Buried Antenna Area
- Glare Shield Buried Antenna Area
- Teardrop Footprint Antenna Installation (GA 55 and GA 56)
- antenna installation instructions
- Doubler Design, Teardrop Footprint Antenna, Skin Thickness 0.051" to 0.063"
- ARINC 743 Footprint Antenna Installation (GA 55A, GA 57X)
- Doubler Design, ARINC 743 Footprint Antenna, Skin Thickness 0.032" to 0.049"
- Doubler Design, ARINC 743 Footprint Antenna, Skin Thickness 0.049" to 0.051"
- Doubler Design, ARINC 743 Footprint Antenna, Skin Thickness 0.051" to 0.063"
- Sample Doubler Location, ARINC 743 Antenna, Metal Skin Aircraft
- Installation of ARINC 743 Footprint Antenna
- Non-Structural Mount Installation
- Example Bracket Antenna Mounting Under Glareshield
- Example Non-structural Antenna Mounting Under Glareshield
- Example Teardrop Antenna Installation in Airframe Under Fabric Skin
- Example Non-structural Antenna Mounting on Airframe
- Section 6 6-1 –
- Software, Configuration, Databases, and XM Activation
- Software Loading Procedure
- Configuration Pages
- acft configuration page
- units configuration page
- sound configuration page
- comm configuration page
- Garmin Database Updates
- available databases
- Section 7 7-1 –
- Post-Installation Checkout and Calibration Procedures
- Recommended Test Equipment
- GSU 73/GMU 44 Post-Installation Calibration Procedure
- Data Validity Requirements for AHRS Calibration Procedures
- Aircraft Alignment
- Magnetometer Interference Test Sequence Example
- Section 8 8-1 –
- Troubleshooting
- Heading Failure Indication (Full-Screen PFD)
- GSU 73 AHRS Operating Mode Table
- Attitude, Air Data, and Engine/Airframe Failure Indication
- AHRS Align Message (PFD)
- GSU 73 – Air Data Troubleshooting
- Attitude, Heading, Air Data, and Engine/Airframe Failure
- Troubleshooting On-board the Aircraft
- GSU Page
- Section 9 9-1 –
- Return to Service Information
- Section 10 10-1 –
- APPENDIX A: G3X Pinouts
- A-2 View of J441 Connector Looking at Rear of Unit
- A-3 Rear View of Connector End Plate
- APPENDIX B: Connector Installation Instructions
- B-2 Jackscrew Backshell Thermocouple Installation
- B.2 Jackscrew Configuration Module Installation into a Jackscrew Backshell
- B-3 Insulation/Contact Clearance
- B-4 Jackscrew Backshell Installation
- B.3 Jackscrew Backshell Installation Instructions
- B-5 Shield Install onto a Jackscrew Backshell (78 pin example)
- B-6 Method A.1 for Shield Termination
- B-7 Insulation/Contact Clearance
- B-8 Method A.2 (Daisy Chain) for Shield Termination
- B-9 Method B.1 (Quick Term) for Shield Termination
- B-10 Method B.2 (Daisy Chain-Quick Term) for Shield Termination
- B-11 Daisy Chain between Methods A and B
- B-12 Method C.1 Double-Shield Termination
- B-13 Method C.2 Double-Shield Termination
- B-14 D-Sub Spliced Signal Wire illustration
- B.4 Circular Connector Installation Instructions
- B-15 Circular Connector Install (19 contact example)
- B-11 Shielded Cable Preparations for Garmin Connectors
- B-17 Insulation/Contact Clearance
- B-18 Daisy Chain Shield Termination
- B-19 Quick Term Shield Termination
- B-20 Daisy Chain, Quick-Term Shield Termination
- B-21 Daisy Chain Shield Termination between Methods A and B
- C-1.1 GDU 37X Outline Drawing
- C-1.2 GDU 37X Panel Cutout Drawing
- C-2.1 GMU 44 Mounting Rack
- C-2.3 GMU 44 Bottom Mounted Installation
- C-2.4 GMU 44 Wiring Detail
- C-3.1 GSU 73 Outline Drawing
- C-4.1 GTP 59 O.A.T. Probe Installation Drawing
- C-5.1 GA 55/55A Installation Drawing
- C-5.2 GA 56 Installation Drawing
- APPENDIX E: External Interface Drawing (Example Only)
- E-1.2 GSU 73 RS-232 and ARINC 429 Examples
|
Page ii G3X Installation ManualRevision A 190-01115-01TABLE OF CONTENTSPARAGRAPH PAGE1 G3X Installation Overview ..............................................................................................................1-11.1 Unpacking Unit ................................................................................................................................1-11.2 Introduction ......................................................................................................................................1-11.3 System Overview .............................................................................................................................1-21.4 General G3X LRU Specifications....................................................................................................1-31.5 Installation Requirements.................................................................................................................1-51.6 Mounting..........................................................................................................................................1-51.7 Wiring/Cabling Considerations........................................................................................................1-52 GDU 37X .........................................................................................................................................2-12.1 Equipment Description.....................................................................................................................2-12.2 Electrical Specifications...................................................................................................................2-22.3 Environmental Specifications ..........................................................................................................2-32.4 Installation Requirements.................................................................................................................2-42.5 Installation Considerations...............................................................................................................2-52.6 Mounting Requirements...................................................................................................................2-52.7 Unit Installation................................................................................................................................2-52.8 Maintenance .....................................................................................................................................2-52.9 Panel Cutout Template .....................................................................................................................2-63 GMU 44 ...........................................................................................................................................3-13.1 Equipment Description.....................................................................................................................3-13.2 Electrical Specifications...................................................................................................................3-13.3 Environmental Specifications ..........................................................................................................3-23.4 GMU 44 TSO/ETSO Compliance....................................................................................................3-23.5 Installation Requirements.................................................................................................................3-33.6 Installation Considerations...............................................................................................................3-33.7 GSU 73/GMU 44 Interconnect Harness Fabrication Instructions....................................................3-53.8 Mounting Instructions ......................................................................................................................3-63.9 Maintenance .....................................................................................................................................3-64 GSU 73.............................................................................................................................................4-14.1 Equipment Description.....................................................................................................................4-14.2 Electrical Specifications...................................................................................................................4-24.3 Environmental Specifications ..........................................................................................................4-34.4 Installation Requirements.................................................................................................................4-34.5 Installation Considerations...............................................................................................................4-44.6 Mounting Requirements...................................................................................................................4-64.7 Unit Installation................................................................................................................................4-74.8 Maintenance .....................................................................................................................................4-8
PreviousNext |