System Maintenance Manual GTN 6XX/7XX Part 23 AML STC 190-01007-A1Page 4-8 Rev. 64.7 GPS/SBAS Antenna Cable Overbraid Inspection (If Installed)The GPS/SBAS antenna cable overbraid must be inspected after a known or suspected lightning strike.Check the antenna and overbraid for the following:1. Check the cable overbraid for pinching, melting or evidence of arcing at the GPS/SBAS antennaend and at the GTN 6XX/7XX.2. Check the lug at the GTN end for evidence of arcing and verify that the lug is still secured to theoverbraid and to the GTN connector shield block.3. Check that the overbraid is securely attached at the GPS/SBAS antenna end and at theGTN6XX/7XX.If any of these checks shows evidence of a lightning strike, replace the overbraid assembly in accordancewith Section 6.9.4.8 WXR HSDB Cable Overbraid Inspection (If Installed)The WXR HSDB cable overbraid must be inspected after a known or suspected lightning strike. Check theoverbraid for the following:1. Check the cable overbraid for pinching, melting or evidence of arcing at the WXR end and at thebulkhead to which the WXR R/T is mounted.2. Check the lug at the WXR end for evidence of arcing and verify that the lug is still secured to theoverbraid and to the WXR shield block.3. Check that the overbraid is securely attached at the bulkhead end.If any of these checks shows evidence of a lightning strike, replace the overbraid assembly in accordancewith Section 6.10.