30 Genie TMZ-34/19 Part No. 97866Operator's Manual Fourth Edition • First PrintingMaterial Lifting ConfigurationSet up1 Turn the key switch to the off position.2 Remove the pin that secures the material liftinghook to the base. Remove the material liftinghook and replace the pin.3 Disconnect the running lights and the platformcontrols from the platform.4 Remove the platform controls. Open the clampon the back of the platform controls and slidethe controls up and off.5 Open the controls side turntable cover.6 Disconnect the electrical cord on the bottomright side of the ground control box. Connect theplatform control cord disconnected in step 3 tothe ground control box. Close the turntablecover.7 Support the platform. Remove the toggle pin thatsecures the platform to the jib boom.8 Lift the platform up and remove it from themachine.9 To install the material lifting hook, insert thebottom rail into the platform mounting bracketand rotate up into position. Insert the toggle pin.10 Operate the material lifting hook from the groundwith the platform controls. The key switchshould be turned to the platform control position.11 Reverse the above process to install theplatform and return the machine to a personnellifting configuration.OPERATING INSTRUCTIONSMaterial Lifting ConfigurationObserve and Obey:Maintain safe distances between the operator,the machine and fixed objects.Be aware of the direction the boom will travelwhen using the platform controls.