37Maintenance and Care6 Maintenance and CareGeneralBefore proceeding to mainte-nance and care work you areadvised to read and complywith the Safety Informationchapter!Compliance with the recommendedmaintenance works will give you thecertitude of always having a reliablemachine at disposition.Daily or weekly maintenance and repairworks may be executed by the driver/operator having been trained accordin-gly. Further Hako system maintenanceworks have to be executed by qualifiedpersonnel only. Please contact your lo-cal Hako Service Centre or Hako con-tract dealer. We cannot be held liablefor damages resulting from non-com-pliance with these instructions.Please indicate the machine's serialnumber with any enquiry or spare partorder, see paragraph 1.7 - Nameplate.6.1 Hako System MaintenanceThe Hako System Maintenance:• guarantees reliable operability of theHako machines (preventive mainte-nance)• minimizes operating costs, repaircosts and maintenance costs• ensures long service life and opera-bility of the machineThe Hako System Maintenance isstructured in separate modules and de-termines specific technical works to beexecuted as well as the intervals forsuch maintenance works. For any spe-cific maintenance type, the replacementparts are determined and listed in sparepart kits.Hako System Maintenance K:To be performed by the customer in ac-cordance to the maintenance and careinstructions contained in the operatinginstructions (daily or weekly). Thedriver/operator will be instructed upondelivery of the machine.Hako-System Maintenance I :(after 50 hours of operation - einmalig)Gilt für Maschinen mit verbrennungs-motorischem Antrieb, 1. Ölwechsel, Fil-ter usw. Durchführung vomSachkundigen eines autorisiertenHako-Service-Stützpunktes.Hako-System Maintenance II:(every 125 hours of operation)To be performed by qualified personnelof authorised Hako Service Centre inaccordance with the machine-specificsystem maintenance including sparepart kit.Hako-System Maintenance III:(every 250 hours of operation)To be performed by qualified personnelof authorised Hako Service Centre inaccordance with the machine-specificsystem maintenance including sparepart kit.Hako-System Maintenance S:(every 500 hours of operation safetycheck)To be performed by qualified personnelof authorised Hako Service Centre inaccordance with the machine-specificsystem maintenance including sparepart kit. Execution of all safety-relevantinspections according to UVV-BGV-TÜV-VDE as prescribed by law.6.2 Maintenance documentMaintenance and Care6 Maintenance and CareGeneralBefore proceeding to mainte-nance and care work you areadvised to read and complywith the Safety Informationchapter!Compliance with the recommendedmaintenance works will give you the6.1 Hako System MaintenanceThe Hako System Maintenance:• guarantees reliable operability of theHako machines (preventive mainte-nance)• minimizes operating costs, repaircosts and maintenance costs• ensures long service life and opera-bility of the machineThe Hako System Maintenance isHako-Service-Stützpunktes.Hako-System Maintenance II:(every 125 hours of operation)To be performed by qualified personnelof authorised Hako Service Centre inaccordance with the machine-specificsystem maintenance including sparepart kit.Hako-System Maintenance III:(every 250 hours of operation)