PreparationNecessary Tools for Installation Procedure for Selecting the LocationჀ Drill ჀჀ Nipper ჀჀ SawჀ Hole 2 3/4 ჀჀ Vacuum pump ჀჀ ჀჀჀ Torque wrench(17mm,22mm,26mm) ჀჀ Pipe cutterჀ Flaring tool ჀჀ Knife ჀჀ Measuring tapeჀ Reamer NNOTE: Cannot be installed hanging from ceiling or stacked.Drawing for the installation of indoor and outdoor unitsSince drain flows out of the outdoor unit,do not place under the unit anything which must be kept away from moisture.Install units,power cords and inter-unit cables at least 10ft away from televison and radio sets,This is prevent interference toimages and sounds.(Noise may be heard even if they are more than 10ft away depending on radio wave conditions.)In coastal areas or other places with salty atmosphere of sulfate gas,corrosion may shorten the life of the air condition.There must be sufficient space for carrying the unit into and out of the site.Installation Manual of Novel SeriesThe site must be free from the possibility of flammable gas leakage in a nearby place.Locate the unit so that the noise and discharged hot air will not annoy the neighbors.There must be sufficient space for air passage and no obstructions aroud the air inlet and air outlet.Gas leakage detector orsoap-and-water solutionChoose a place solid enough to bear the weight and vibration of the unit,where the operation noise will not be amplified.Choose a location where the hot air discharged from the unit or the operation noise,will not cause a nuisance to the neighborsof the user.Avoid places near a bedroom and the like,so that the operation noise will cause no trouble.