Contents - Table Of Contents
- safety notices
- Installing the Model 024, ESLL, or ESLS storage enclosure
- Completing inventory for the 5147-024, ESLL, or ESLS storage enclosure
- Installing support rails into the rack
- Installing the 5147-024, ESLL, or ESLS storage enclosure into a rack
- Optional: Install disk drives or SSDs in the 5147-024, ESLL, or ESLS storage enclosure
- Connecting the 5147-024, ESLL, or ESLS storage enclosure to your system
- Connecting cables, power cords, and installing covers
- Completing the 5147-024, ESLL, or ESLS storage enclosure installation
- Reference information
- Stopping a system by using the HMC
- Stopping an IBM PowerKVM system
- Starting a system by using the ASMI
- Starting an IBM PowerKVM system
- Connector locations for the 5147-024, ESLL, and ESLS storage enclosures
- Connector locations for the 8247-42L and 8286-42A systems
- Connector locations for the 8408-44E and 8408-E8E systems
- Connector locations for the 9080-MHE, 9080-MME, 9119-MHE, and 9119-MME systems
- Notices
- Accessibility features for IBM Power Systems servers
- Privacy policy considerations
- Trademarks
- Class B Notices
- Terms and conditions
|
CAUTION:Removing components from the upper positions in the rack cabinet improves rack stability duringrelocation. Follow these general guidelines whenever you relocate a populated rack cabinet within aroom or building.v Reduce the weight of the rack cabinet by removing equipment starting at the top of the rackcabinet. When possible, restore the rack cabinet to the configuration of the rack cabinet as youreceived it. If this configuration is not known, you must observe the following precautions:– Remove all devices in the 32U position (compliance ID RACK-001 or 22U (compliance ID RR001)and above.– Ensure that the heaviest devices are installed in the bottom of the rack cabinet.– Ensure that there are little-to-no empty U-levels between devices installed in the rack cabinetbelow the 32U (compliance ID RACK-001 or 22U (compliance ID RR001) level, unless thereceived configuration specifically allowed it.v If the rack cabinet you are relocating is part of a suite of rack cabinets, detach the rack cabinet fromthe suite.v If the rack cabinet you are relocating was supplied with removable outriggers they must bereinstalled before the cabinet is relocated.v Inspect the route that you plan to take to eliminate potential hazards.v Verify that the route that you choose can support the weight of the loaded rack cabinet. Refer to thedocumentation that comes with your rack cabinet for the weight of a loaded rack cabinet.v Verify that all door openings are at least 760 x 230 mm (30 x 80 in.).v Ensure that all devices, shelves, drawers, doors, and cables are secure.v Ensure that the four leveling pads are raised to their highest position.v Ensure that there is no stabilizer bracket installed on the rack cabinet during movement.v Do not use a ramp inclined at more than 10 degrees.v When the rack cabinet is in the new location, complete the following steps:– Lower the four leveling pads.– Install stabilizer brackets on the rack cabinet.– If you removed any devices from the rack cabinet, repopulate the rack cabinet from the lowestposition to the highest position.v If a long-distance relocation is required, restore the rack cabinet to the configuration of the rackcabinet as you received it. Pack the rack cabinet in the original packaging material, or equivalent.Also lower the leveling pads to raise the casters off of the pallet and bolt the rack cabinet to thepallet.(R002)(L001)DANGER: Hazardous voltage, current, or energy levels are present inside any component that has thislabel attached. Do not open any cover or barrier that contains this label. (L001)(L002)viii Power Systems: Installing the Model 024, ESLL, or ESLS storage enclosure PreviousNext |