29START-UP CHECKLIST(Remove and Store in Job File)I. Preliminary InformationMODEL NO.:_________________________________SERIAL NO.:__________________________________DATE:_______________________________________TECHNICIAN:_________________________________II. PRE-START-UP (Insert checkmark in box as each item is completed)( ) VERIFY THAT ALL PACKING MATERIALS HAVE BEEN REMOVED FROM UNIT( ) REMOVE ALL SHIPPING HOLD DOWN BOLTS AND BRACKETS PER INSTALLATION INSTRUCTIONS( ) CHECK ALL ELECTRICAL CONNECTIONS AND TERMINALS FOR TIGHTNESS( ) CHECK GAS PIPING FOR LEAKS (WHERE APPLICABLE)( ) CHECK THAT INDOOR (EVAPORATOR) AIR FILTER IS CLEAN AND IN PLACE( ) VERIFY THAT UNIT INSTALLATION IS LEVEL( ) CHECK FAN WHEEL, AND PROPELLER FOR LOCATION IN HOUSING/ORIFICE AND SETSCREW TIGHTNESSIII. START-UPELECTRICALSUPPLY VOLTAGE __________________________________COMPRESSOR AMPS_________________________________INDOOR (EVAPORATOR) FAN AMPS___________TEMPERATURESOUTDOOR (CONDENSER) AIR TEMPERATURE ___________DBRETURN-AIR TEMPERATURE ___________DB ___________WBCOOLING SUPPLY AIR ___________DB ___________WBGAS HEAT SUPPLY AIR ___________PRESSURESREFRIGERANT SUCTION ___________PSIG SUCTION LINE TEMP*___________REFRIGERANT DISCHARGE ___________PSIG DISCHARGE TEMP†___________( ) VERIFY REFRIGERANT CHARGE USING CHARGING CHARTS*Measured at suction inlet to compressor†Measured at liquid line leaving condenser.MEASURED TEMPERATURE RISE___________TEMPERATURE RISE (See Literature) RANGE ___________GAS HEAT TEMPERATURE RISEGAS MANIFOLD PRESSURE ___________ IN.WGGAS INLET PRESSURE ___________ IN.WG