13Mexico Super RS 3/60P - 3/100P - InstallationINSTALLATIONINSTALLATION8 FITTING THE FLUE ASSEMBLY - Duct lengths up to 400 mm (16") - RS 3/60P ONLYFlue terminalshown in positionA. Air duct joinB. Flue duct join6.Terminal grillesecuring screws - 2 off.7.Terminal flue securing screws - 4 off.Legend1.Boiler air duct.2.Boiler flue duct.3.Terminal air duct.4.Terminal flue duct.5.Terminal grille.5.Terminal grille assembly.6.Terminal grille.7.Securing screws - 2 off.8.Splitter plate.Legend1.Boiler air duct.2.Boiler flue duct.3.Terminal air duct.4.Terminal flue duct.9 FITTING THE FLUE ASSEMBLY - Duct lengths up to 400 mm (16") - RS 3/75P & RS 3/100P1. Remove the 2 securing screws (6) and separate the terminalgrille from the terminal assembly.2. Remove the 4 securing screws (7) and separate the terminalflue duct from the terminal air duct.3. From OUTSIDE of the building, pass the terminal air ductthrough the wall opening and slide it into the boiler air duct,locating it as shown.4. Push the terminal air duct fully in until the fixing bracketscontact the wall face.5. Ensure that the duct is level and make good between thewall and duct, from OUTSIDE of the building.6. From OUTSIDE of the building, seal the air duct join (A) withthe mastic provided.7. From OUTSIDE of the building, pass the terminal flue ductthrough the wall opening and slide it into the boiler flue duct.Locate it as shown and fix it in position with the 4 screwspreviously removed.8. From OUTSIDE of the building seal the flue duct join (B)with the mastic provided.9. Fasten the terminal grille to the duct assembly.1. Remove the 2 screws and separate the terminal grille,terminal air duct and terminal flue duct.2. From OUTSIDE of the building, pass the terminal air ductthrough the wall opening and slide it into the extension airduct, locating it as shown.3. Push the duct fully in until the fixing brackets contact thewall face.4. Ensure that the duct is level and make good between thewall and the duct from OUTSIDE of the building.5. From OUTSIDE the building, seal the duct join (A) with themastic provided.6. From OUTSIDE the building, pass the terminal flue ductthrough the wall opening and slide it into the boiler flue ductpushing the flue duct fully in, up to the locating stops.Locate it as shown.7. From OUTSIDE of thebuilding, seal the duct join(B) with the mastic provided.8. Fasten the terminal grille tothe duct assembly.A. Air duct joinB. Flue duct joinFlue terminalshown in position