Assembly1. Screw plastic knob (A, Fig. 1) onto handle shaft(B, Fig. 1). Screw handle shaft into downfeedhub (C, Fig. 1) and tighten. Flat spot on shaftaccommodates a combination or adjustablewrench. Note: Handle shafts are alreadyinstalled into hub on JMD-18PFN.2. Repeat for other two shaft assemblies.3. Slide crank (A, Fig. 2) onto shaft and tighten setscrew (B, Fig. 2). Be sure set screw seats on flatpart of shaft.4. Insert handle (C, Fig. 2) into crank and tighten.5. Slide handwheel (A, Fig. 3) onto tablehandwheel shaft and tighten set screw. Inserthandle (B, Fig. 3) into handwheel and tighten.6. Repeat for two remaining table hand wheels.Installation1. The location for the mill/drill should be well lit,dry, and have room enough to allow the head torotate 3600.2. Place nylon slings with a load rating exceedingthe weight of the mill/drill around the head sothat the sling will not damage any parts whentensioned. See Fig. 4.3. Carefully lift the mill/drill to a sturdy stand or workbench. For best performance, through bolt themill/drill to a bench or stand.4. Before bolting the mill/drill to a bench or stand,the unit must be level in both directions. Place alevel on the table in both directions.5. If the table is not level, shim under the low corner(s) untilleve!. Tighten the fastening bolts.Check for level again. Adjust as necessary untilFig. 1Fig. 2~.Fig. 3 ...V\J)5