ELECTRICAL DATA FOR THE USE OF CERTIFIED LICENSED ELECTRICIANWARNING: Shock Hazard! Under No Circumstances Should This Spa Be Installed By AnyoneOther Than A Certified Licensed Electrician!All wiring MUST be in accordance with the National Electrical Code and all local codes.W A R N I N G : U S E C O P P E R C O N D U C T O R S O N LY !P2 SERIES 240 VOLT HARD WIRE INSTALLATIONCONVERSION OF THE P2 SERIES EQUIPMENTWiring of the P2 volt system must be completed by a certified licensed electrician.A G.F.C.I. AND A DISCONNECT SWITCH ARE REQUIRED.The National Electrical Code requires that spas connected to 240 volt circuits be equipped with a G.F.C.I. and Disconnect Switch. See National ElectricCode Articles 680-12 and 680-42.LEISURE BAY’S P2 SERIES SPAS ARE NOT EQUIPPED WITH A 240V G.F.C.I. OR A DISCONNECT SWITCH. A G.F.C.I.SHOULD BE INSTALLED BY A CERTIFIED LICENSED ELECTRICIANOUTDOOR LOAD CENTER PROVIDES BOTHThe addition of an outdoor load center such as a Siemens W0408ML 1125 or equal must be added to the circuit. This type of load center provides botha G.F.C.I. and Disconnect Switch in a convenient configuration as required by the National Electric Code.ISOLATED, DEDICATED 240 VOLT, 30 OR 50 AMP CIRCUITS ARE REQUIREDAn isolated, dedicated 240 volt, 30 or 50 amp circuit is required to provide the power necessary to properly operate the 240V equipment package.PERMANENTLY HARD WIREDAll 240 volt operations wiring must be permanently hard wired and installed in grounded conduit and installed in compliance with the National ElectricalCode and all local codes.WIRE SIZING MUST MEET ELECTRICAL CODESAll installations are different. Wire sizing must meet the National Electrical Code and all local code specifications.9