Wall Mount the XN120 system8 XN120 Expansion Unit Guide3- Wall Mount the XN120 Expansion UnitInstallation Considerations: To avoid electric shock or damage do not plug in or turn on the system power before completing theinstallation. Avoid working with the system during electrical storms. Use the power cord supplied with the product. Do not bundle power cords together, the cords may overheat. Ensure the system has a suitable Earth Ground connection.Environmental Considerations – Be sure the system is not: In direct sunlight or in hot, cold or humid places. In dusty areas or in areas where sulfuric gasses are produced. In places where shocks or vibrations are frequent or strong. In places where water or other fluids may come into contact with the equipment. In areas near electric welders or machines that emit high frequency radiation. Near computers, microwaves, air conditioners etc. Near radio antennas (including shortwave). If you are installing the optional 2OPBOX or an additional expansion unit ensure there is sufficient wallspace and ventilation. Refer to the wall mounting diagrams below.1 The expansion unit is 360mmx 279mm (W x H).It can be installed in anyposition near the XN120main unit within the lengthof the RJ45 connectingcable supplied.See the examples below.! You will need more space ifyou are installing the optional2OPBOX.Refer to the installationinstructions supplied with theunit.Use the wall mount template supplied to mark the four screw locations.Ensure that you use the correct wall plugs for the type of wall.Leave approximately 3~5mm of the screwprotruding from the wall.Have 200mm below the unit forother cables connected to thesystem.Have 100mm onthe left side ofthe unit for thepower cable.Have 200 mm abovethe unit for ventilation.Have 100mmon the rightside.! additional146mm forthe 2OPBOX